Our Role

  • 11.5 km dual carriage way linking Monaro Highway with the federal highway
  • 485,000 tube stock
  • 1200 trees
  • 50 000 shrubs
  • Erosion control – jute matting installed through open swale drains , enkamat installed on bridge embankments underneath topsoil , coir matt installed on bridge embankments on top of soil
  • 5 Ha of garden bed construction –including cultivating ,soil installation , soil conditioning , mulching and planting
  • 3.5km of subsoil drainage installation into garden beds

Main contractor: –
Location:   Majura, ACT
Surface Area: –
Year Completed:   –
Value: –