Our Role
- 11.5 km dual carriage way linking Monaro Highway with the federal highway
- 485,000 tube stock
- 1200 trees
- 50 000 shrubs
- Erosion control – jute matting installed through open swale drains , enkamat installed on bridge embankments underneath topsoil , coir matt installed on bridge embankments on top of soil
- 5 Ha of garden bed construction –including cultivating ,soil installation , soil conditioning , mulching and planting
- 3.5km of subsoil drainage installation into garden beds
Main contractor: –
Location: Majura, ACT
Surface Area: –
Year Completed: –
Value: –